How it's made
From artwork review to shipment preparation.
The process demonstrates signage knowledge without making unsupported factory-ownership or capacity claims.
- 01Artwork review
Review logo files, target dimensions, application and lighting preference before quoting.
- 02Shop drawing
Confirm dimensions, structure, mounting, wiring and installation intent before production starts.
- 03Material preparation
Prepare acrylic, metal, finishes, LEDs and mounting components according to the approved design.
- 04Letter or sign construction
Build the sign body, letter structure or panel system to the confirmed dimensions.
- 05LED and electrical assembly
Install LEDs, wiring and power components for the specified lighting style.
- 06Surface finishing
Apply paint, metal finish, acrylic face treatment or other approved surface details.
- 07Illumination test
Light the sign to review color, brightness and consistency before packaging.
- 08Quality inspection
Check appearance, wiring, mounting components, waterproofing where applicable and packaging condition.
- 09Protective packaging
Pack faces, returns, wiring and accessories to reduce transit risk.
- 10Shipment preparation
Prepare the finished sign and supporting parts for delivery.